Sign In | Join Free | My chinaqualitycrafts.com |
|
Brand Name : ChenMu
Model Number : CM-SZ130130-A90° -30H1
Certification : ROHS,UL,SGS,
Place of Origin : Zhejiang,China
MOQ : 500PCS
Price : Negotiable
Payment Terms : T/T, Western Union, MoneyGram
Supply Ability : 20000PCS/Day
Delivery Time : 3-5 working days
Packaging Details : Cartons
Beam Angle : 90 degree
Power : 300W, 60W/90W/120W/150W/180W, 120w, 50W 100W 150W 200W 250W 300W, 80w/100w/120w/150w/200w/240w/300w
Material : Plastic, Optical grade PC,pc
led : Philips 5050 ect
Application : Tunnel light
Temperature : 2700K-6500K
Square Clean Lenses 90 Degree 5050 Led 60W Module For Tunnel Lighting
Quick detail
Product Name: | CM-SZ130130-A90° -30H1 | Beam Angle: | 90° |
Efficiency: | 92% | Material: | PC |
LED Chips | 5050 | Size: | L130*W130 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
Other Light Distribution: | 30°/60°/ 90°/T2M/T3M/Vertical T2M/ Vertical T3Mect | ||
Application: | Street Light,Flood Light,Tunnel Light |
Description
Specifications
Product Name: | CM-SZ130130-A90° -30H1 |
Beam Angle: | 90° |
Efficiency: | 92% |
Material: | PC |
LED Chips: | 5050 |
Size: | L130*W130 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Other Light Distribution: | 30°/60°/ 90°/80*150°ect |
Application: | Flood Light,Tunnel Light, Street Light |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
![]() |
Square Clear LED Ceiling Light Lens Plastic 90 Degree 5050 For Tunnel Lighting Images |